The Township completed a Schedule B Class EA Infrastructure Master Plan (IMP) for the Community of Angus in 2022, identifying preferred solutions for water and wastewater infrastructure to support development over the next 25 years. The Notice of Completion was filed on September 12, 2022. An Addendum to the IMP is being completed, focused on water supply and storage solutions in Angus. The purpose of this Class EA Addendum is to verify the feasibility of preferred water supply and storage solutions identified in the Angus IMP and prioritize projects for implementation going forward.

Preliminary Class EA Addendum Report:

A Preliminary Study Report is completed, identifying technically and economically feasible solutions and project prioritizations to ensure sufficient water supply and storage for the growing Angus community. These proposed solutions are designed to be socially, culturally, and environmentally responsible. The results of this report will be shared with public through a virtual Public Information Center (PIC) to gather community input and refine the approach before advancing to detailed design and implementation. The PIC will consist of a short presentation (repeated at 7:00PM & 8:00PM), followed by a question-and-answer period. 

Representatives from the project team will be present to provide the presentation and answer questions regarding the preliminary study report. 

Information will be collected in accordance with the Municipal Freedom of Information and Protection of Privacy Act (‘MFIPPA’).  With the exception of personal information, all comments will become part of the public record.

We note that given the status of this project as an EA Addendum, this PIC is an optional point of public contact  under the EA process, being completed at the discretion of the Township and their project team. The preliminary Study Report will be updated based on input received at the PIC and a final version will be issued for a 30-day public review period along with a notice of Addendum in accordance with the EA Process.

VIRTUAL PUBLIC INFORMATION CENTRE:   

Thursday November 21st, 2024   - 7:00 pm to 9:00 pm                                   
Angus IMP Addendum

Digital PIC Meeting Weblink (Zoom):

Meeting ID: 872 8963 8001
Passcode: 123456 
Zoom Room Opens @ 6:45 PM

If you are unable to attend or require further information, please contact or provide any comments in writing (either before, during, or after the PIC) to:

Josh Maitland, P. Eng.
Consultant Project Manager
Greenland Consulting Engineers
120 Hume Street
Collingwood, ON L9Y 1V5
Email: jmaitland@grnland.com 

John Kolb
Manager of Public Works

Township of Essa
5786 County Road 21
Utopia, ON L0M 1T0
Email: mmikael@essatownship.on.ca 

 

Scroll to top